Portfolio
Past Projects
A Sampling of a Few of our Most Recent Work
Accolade Centre
York University, Toronto, Ontario
Architect: Zeidler Partnership
Owner’s Representative: Schick Shiner and Associates
This educational facility, totaling 350,000 square feet and costing $100m, was opened in the spring of 2006. It is the home of the York University Music Department and Dance Department. It includes a 350 seat proscenium theatre, 350 seat recital hall, 85 seat dance studio, 200 seat acting studio, 500 seat cinema, music teaching spaces, dance teaching spaces, classrooms and theatre production support spaces.
Schick Shiner and Associates wrote the building programme for the facility and acted as the owner’s representative during the design and construction finally completing a 6 month residency overseeing the final construction and the purchase and installation of $3m of theatre technical equipment.
The Peter and Jeanne Lougheed Centre for the Performing Arts
Camrose, Alberta
Architect: BR2 Architects (Edmonton)
Theatre Consultants: Schick Shiner and Associates
This project is a joint venture of the City of Camrose, University of Alberta and the Township of Camrose. It is located on the Augustana College site in the City of Camrose and includes a 550 seat proscenium theatre, 2000sf multi-purpose space and related support spaces. Opened in October, 2014.
St. Michaels College School
Toronto, Ontario
Architect: CS&P Architects (Toronto)
Design Architect: Peter Smith
Theatre Consultant: Schick Shiner and Associates
This 450-seat school theatre is located in St. Michaels private school in Toronto.
E. A. Rawlinson Centre for the Arts
Prince Albert, Saskatchewan
Architect: Stantec (Regina)
Theatre Consultants: Schick Shiner and Associates
This 550 seat theatre and regional art gallery opened in 2002. Schick Shiner and Associates were involved in the project from 1995 and worked on all phases of the project from the feasibility study, building programme, operations study as well as the design.
Projects - Current and Completed
In the past 34 years the firm or its principals have been involved in many theatre development and construction projects. Listed briefly are some of the more important projects, current and past.
- James Cowan Theatre, Burnaby, BC; New theatre to replace the existing James Cowan Theatre. Full theatre consulting services.
- Hamber School Theatre, Vancouver, BC: Vancouver School Board Theatre Consultant for a design/build school project which includes a 300 seat theatre.
- Orange Hub, City of Edmonton; Stage floor and orchestra pit replacement.
- Bowen Island Community Centre – Multi-purpose Room; General theatre consulting for this multi-purpose community centre.
- Myer Horowitz Theatre, Student Union Building, University of Alberta, Edmonton, AB; Theatre renovation project.
- Performing Arts Centre, Whitecourt, AB; Full theatre consulting services for a 600 seat theatre. With BR2 Architecture.
- Cowichan Senior Secondary Drama Studio, Duncan, BC: Full theatre consulting services.
- Fernie and District Arts Centre Feasibility Study, Fernie, BC: Feasibility Study.
- Ortona Armoury Arts Centre, Edmonton, Alberta: full theatre consulting services for the Courtyard Performance Venue for Arts Habitat.
- Pantages Theatre Renovation, Winnipeg, Manitoba; Renovation of a 1930 heritage theatre for the Winnipeg Symphony Orchestra, With Number 10 Architecture Fall/2022.
- Orange Hub, City of Edmonton; Operations study, Complete Fall, 2022.
- Kelowna Theatre Project – Review of the Colliers 2018 Performing Arts Centre Suitability Study. Completed Sept/22.
- Royal and McPherson Theatre Society, Victoria, BC; Programming and design study for the addition of rehearsal hall, back of house support spaces and public spaces to the Royal Theatre. Completed Fall/2022.
- New Theatre Victoria, BC: Feasibility study for a new multi-purpose hall in the City. Completed Fall/2022.
- City of Beaumont, Alberta, Programming and operations study. Completed Spring 2021.
- Gros Morne Theatre Festival, Cow Head, Newfoundland; Full theatre consulting Services. With Lat49 Architecture Completed Fall/2020.
- Memorial University, St Johns, NFL; LED lighting study and replace for 2 concert halls. Completed Fall/2020.
- University of Victoria, Victoria, B.C.; replacement of projection screen masking and stage drapes for the Cinecentre Theatre on Campus. Completed Summer, 2019.
- Chemainus Valley Arts Cultural Society, Chemainus, BC – Feasiltiy Study for a community arts centre. Completed Fall, 2020.
- Western Manitoba Centennial Auditorium; Design of the Front of House speaker system. Project abandoned for lack of funding.
- City of Victoria, BC; Equipment inventory for insurance purposes for the McPherson Theatre Completed Summer 2020.
- University of Victoria, Victoria, B.C.; replacement of projection screen masking and stage drapes for the Cinecentre Theatre on Campus. Completed Fall.2020.
- Chemainus Valley Arts Cultural Society, Chemainus, BC – Feasibility Study for a community arts centre. Completed Nov/2020.
- Winnipeg School District, Winnipeg, Manitoba – Asbestos Fire Curtain Replacement Project and Stage Rigging Assessment, rigging design and specifications. Complete installation January, 2021.
- Reid Theatre, Memorial University, St Johns, NFL; Full theatre consulting services for the complete renovation of the 1950’s theatre. With Latitude49 Architects. Project waiting for funding.
- Orange Hub (John Haar Theatre), City of Edmonton, Edmonton AB; Re-equipping the theatre for community use after Grant McEwan University relocated its campus. Completed Fall, 2019.
- James Cowan Theatre, Burnaby, BC; Feasibility and theatre development options for Urban Arts Architecture. Completed Summer 2018.
- Artist Quarters, Edmonton, AB; Full theatre consulting services for a 250 seat studio theatre and a dance centre. Project was abandoned due to a lack of funding.
- City of Kelowna, BC; Theatre Operation Assessment and recommendations for the existing 850 seat community theatre. Completed Spring 2019.
- City of Quesnel, BC, Feasibility Study; Updating the study SSA completed in 2007 for the City; Completed June, 2018
St Johns School, Vancouver, BC; Consulting services for a drama room and video studio Opened January, 2019. - City of Kelowna, New theatre feasibility, building programme, development options for Colliers Project Leaders. Completed Spring, 2018.
- LED Replacement Study, City of Surrey, BC; Assessment for the replacement of the stage lighting fixtures and control system for the City’s 3 theatre spaces. Completed January, 2018.
- Demographic and Market Demand Study, City of Kelowna, BC; For Colliers Project Leaders. Completed Spring, 2018.
- John Haar Theatre, Grant McEwan University, Edmonton AB; Theatre assessment for the City of Edmonton, Completed September 2016.
- Lillian Osborn High School Theatre, Edmonton, AB; Full theatre consulting services for the outfitting of a studio theatre. Client: Edmonton Public School Board Opened June 2018.
- Community Centre, Invermere, BC; Multi-purpose community centre (with Shape Architecture) Opened September 2018.
- Royal and McPherson Theatre Society, Victoria, BC; Fire Curtain replacement consulting for both Theatres Winter, 2018.
- Calgary Public Library; Calgary, AB; Design of the stage lighting system for the main lecture hall. Winter/2018
- Performing Arts Centre, Steinbach, Manitoba; Full Consulting services for a 750 to 100o seat theatre. With Stantec Architecture (Project Abandoned Spring 2017)
- Crofton House, Vancouver, BC; Full theatre consulting services to substantially renovate the existing auditorium and add a studio theatre/classroom. With Cornerstone Architects. Opened October 2017
- North Centre Canada Centre for Arts and the Environment, Flin Flon, Manitoba (Flin Flon Arts Council); Feasibility Study for a theatre, arts centre, environment centre. Completed Spring/2017
- Coquitlam School District 43, Coquitlam, BC; Full theatre consulting services for a 300 seat theatre in a new senior secondary school. Opened Spring, 2017
- McPherson Playhouse, Victoria, BC, Theatre Equipment Inventory for insurance purposes; City of Victoria. Completed December 2016
- Greenwood College School, Toronto, Ontario; full theatre consulting services for this 144 seat school theatre in the new academic building. Opened November, 2016
- Performing Arts Centre, Hinton, AB; Full theatre consulting services for a 260 seat studio theatre. With MTA Architecture. Completed in September, 2016
- Performing Arts Centre, Hinton, AB; Development of an operational plan and society. Completed Spring/2016
- Slave Lake Wildfire Legacy Project, Slave Lake, Alberta; full theatre consulting services for this 400 seat community theatre in the new recreation centre. Opened June/2016
- Community Centre, Humboldt, Sask; Feasibility study for a recreation, community centre and theatre. With P3 Architecture. Completed Fall/2015
- Myer Horowitz Theatre, Student Union Building, University of Alberta, Edmonton, AB; Theatre assessment and renovation plan study. Completed March/2016
- Canna Community Cultural Centre, Lacombe, AB; Feasibility Study for Theatre and Children’s Resource Centre. Completed Fall/2015
- Strathcona Tweetsmir School, Calgary, AB; Design study to renovate the existing school theatre. With Group 2 Architecture. September, 2015
- UBC Student Centre; Design of stage lighting systems and drapery systems for “The Nest” and The Great Hall” Completed Fall/2016
- University of Victoria, Victoria, BC; Special consultant for a facility use and functional study for the theatre and visual arts. With Brenda Beck Associates. June. 2015
- West Shore Arts Centre (Colwood Community Theatre), Colwood, BC; Project Management for project development. Completed Spring, 2015
- Splatsin First Nation Community Centre, Enderby, BC; Design of performance and Presentation Systems. Opened November, 2015
- St Andrews College School, Aurora, Ontario; Full theatre consulting services for a renovation of the existing auditorium. Opened Spring, 2015
- Tidemark Theatre, Campbell River, BC; Design and project manager for stage lighting upgrade. Competed September, 2015
- West First Theatre Centre, Vancouver, BC; Full theatre consulting services for a 300 seat studio theatre. Opened October, 2015
- Kamloops Performing Arts Centre Study; Feasibility study for a 1200 seat and 350 seat theatre (With HMPM and Proscenium Architecture). Completed Spring, 2015
- The Grand Theatre, Maple Creek, Sask; Feasibility study to restore a heritage community hall/theatre (with Dialog Architecture) Completed Dec/14.
- Calvin Kruk Arts Centre, Dawson Creek, British Columbia, full theatre consulting services for this 250 seat studio theatre in the new cultural centre. Opened September/2014
- Augustana College (University of Alberta), Camrose, Alberta; Full theatre consulting services for a 550 seat theatre. Opened November/2014
Shawnigan Lake Private School; Programming Study for a theatre building expansion. Fall/2014 - Performing Arts Centre, American University of Kuwait, Kuwait, Full theatre consulting services for a 500 seat theatre, 150 seat studio theatre, TV studio, recording studios and classrooms.
- South Alberta Jubilee Auditorium, Calgary, Alberta: Assessment and repair of motor and motor control systems for the acoustical banners and other stage machinery. May/2014
- Victoria Performing Arts Centre Coalition; Victoria, BC; Development of a building programme for a new home for the Victoria Symphony and Victoria Opera. June/2014
Town of Kindersley, Saskatchewan: Feasibility study for a recreation centre being undertaken by Group 2 Architects. Complete July, 2013 - Glenlyon Norfolk School, Victoria, British Columbia; Full theatre consulting services for a 450 seat theatre in a private school Opened March/2013
- South Surrey Community Theatre, Surrey, BC; Programming study for this 350 seat community theatre in a mixed-use development. Client: Bing Thom Architecture. Completed Spet/2012
- Colwood Community Theatre, Colwood, BC; Feasibility Study for a new 600 seat theatre and arts centre. Completed Feb/2012
- Artist Centre, St John’s, Newfoundland; Demand and Needs Analysis and Business Plan. In partnership with Sheppard Case Architects. Completed March/2013
- Royal St George’s College, Toronto, Ontario; theatre consulting services for a large drama studio. Client: Royal St George’s College Opened Jan/2013
- Reid Theatre, Memorial University, St John’s, Newfoundland; Facility assessment and development plan for this 400 seat theatre on the St John’s campus. In partnership with Sheppard Case Architects Fall/2012
- Jubilee Auditoria (Southern and Northern), Edmonton and Calgary, Alberta; Study and recommendations for policies and procedures for the orchestra pit net use. Oct, 2012
- Dekker Performing Arts Centre, North Battleford, Saskatchewan; Full theatre consulting services for a 450 seat community theatre. Opened Sept, 2012
- Bill Woodward School, School District 61, Alberta; Design and specifications for a stage drapery and grid system Completed Summer/2012
- Rigging Assessments, Edmonton Public School Board, Edmonton, Alberta; Assessment of the rigging and overhead suspension systems for 16 schools. Specifications and oversight for all repair work. Completed Sept, 2012
- Calgary Arts Development Corporation, Calgary Alberta; Assessor for the 2012 Cultural Spaces Investment Process. Completed Spring/2012
- Dekker Centre for the Performing Arts, North Battleford, Saskatchewan; Management study for the operation of the proposed performing arts centre. Completed Fall/2011
- Edmonton Opera, Edmonton, Alberta; Needs assessment for a new performing arts centre Completed Nov/2011
- Provident Place, Town of Redwater, Alberta; Theatre Consulting services for a multi-purpose presentation space. Client: Barr Ryder Architects. Completed October/2011
- City of Lethbridge, Alberta; Peer review of a performing arts centre feasibility and design study. Completed October/2011
- Malkin Bowl, Stanley Park, Vancouver, BC; Theatre consulting services for the renovation to this outdoor theatre. Client: Birmingham & Wood Architects. Completed Spring/11
- Calgary Arts Development Corporation, Calgary Alberta; Assessor for the 2011Cultural Spaces Investment Process. Completed Spring/2011
- Mayfield Hotel Dinner Theatre, Edmonton, Alberta; Dinner theatre facility assessment. completed Spring/2011
- Prince George Regional Performing Arts Centre Society, Prince George, BC; Development of a five year business plan and operational model for a planned arts centre. Jan/11
- University of Saskatchewan, Saskatoon, Sask; Management study for the operation of the proposed arts and education centre. Dec/10
- Abbotsford Entertainment and Sports Centre, Abbotsford, BC; Sound system design for a 7,500 seat arena. Opening Summer, 2009
- Olympic Speed Skating Oval, City of Richmond: develop infrastructure and flexibility to enable the building to be used by the community after the 2010 Olympics as a multi-purpose venue. Design of facility sound system. Opening Spring, 2009
- York House School Theatre; Full theatre consulting services for a 350 seat theatre in a private school in Vancouver, BC. Opened in the Fall/08
- Buhler Performing Arts Centre, Morden, Manitoba; Full theatre consulting services this 700 seat community theatre. Project cancelled in the Spring/08 due to funding complexities
- Persephone Theatre, Saskatoon, Saskatchewan; Full theatre consulting services for this professional regional theatre. Opened January/08
- Burton Theatre Planning Study, York University, Toronto, Ontario; A study developing options for the re-development of the Burton Theatre Facility. The Burton is a 600 seat thrust theatre built in 1966 and requires redevelopment to complement the new Accolade Centre (see project below). Completed Nov/07
- Keyano College, Fort McMurray, Alberta; Development Plan including specifications to create two dance studios from two existing music classrooms. Spring/06
- Accolade Centre – York University, Toronto, Ontario: The firm acted as an adviser to the University on arts specific issues by reviewing and commenting on the work by the project design team. In addition the firm guided the University Purchasing Department and Faculty of Fine Arts in the purchase of $3.5m in theatre equipment. The firm was resident on site for the last 6 months of construction as the owner’s representative in this design/build project. This work is a follow on to the building programming study that the firm completed in 2003. This 350,000 sq ft, $100m building opened in March/06.
- Edmonton Convention Centre, Edmonton, Alberta: Design and engineering of acoustical banners for expansion of exhibition spaces. For Cohos Evamy Architects, Edmonton Complete March.06
- Kwanlin Dun Cultural Centre, Whitehorse, Yukon: Theatre consulting services. Completed Nov/05
- Tumbler Ridge, British Columbia; Performing Arts Centre Feasibility Study. Completed Oct/06
- Quesnel and Community Economic Development Corporation, Quesnel, BC; Performing Arts Centre Feasibility Study. Completed Oct/06
- Victoria School for the Arts, Edmonton, Alberta: Full arts facility consulting services for theatre, visual arts, media arts and music for a $64 million new K to 12 school (Project stalled for funding). 2003/2004
- Arden Theatre, St Albert, Alberta: Project Management orchestra pit lift mechanism replacement. December/04
- Douglas College, New Westminster, BC: Life cycle review of theatre equipment and systems infrastructure. Summer/05
- Paramount Theatre Redevelopment, Edmonton Downtown Business Development Corporation: Feasibility and Needs Assessment Study. This study tests the feasibility of redeveloping an 800 seat cinema (1950) into a live performance venue. December/2004
- Shell Theatre, Dow Centennial Centre, City of Fort Saskatchewan: Full theatre consulting services for a 550 seat theatre. July/02 to Oct/04
- Operating Study for School District #40, New Westminster, BC: Assessment of current operating agreement and development of alternative operating models and budgets for a 1250 seat theatre. Feb/Mar, 2004
- Funding Study, Victoria, BC: Development of a funding model for the Royal and McPherson Theatre Society to programme unused theatre rental inventory to encourage community use. Feb/Mar, 2004
- Capitol Theatre, Moose Jaw, Saskatchewan: Full theatre consulting services for a 450 seat theatre and arts centre. Opened May, 2004
- Centre Street Church, Calgary, Alberta: Rigging system design. Jan/04
- 1st Christian Reform Church, Calgary, Alberta: Sanctuary Lighting System. Sept/04
Arden Theatre, St Albert, Alberta: Assessment and upgrade on orchestra lift. Dec/03
- York University, Toronto, Ontario: Development of a building programme, detailed space descriptions and technical systems design for a new performance centre containing a theatre, recital hall and support spaces (350,000 sf and $100m). July/03
Mount Royal College Recital Hall and Music Conservatory: Building programme and design study for a 600 seat music venue and music conservatory. With Cornerstone Planning, Vancouver. March/03 - Prince Albert Performing Arts Centre, Prince Albert, Saskatchewan: Full theatre consulting services for a 600 seat theatre and arts centre. The building opened June/03
Brentwood College Private School, Mill Bay, British Columbia: Full theatre consulting services for a 450 seat theatre. The building opened Sept/03 - Edmonton Public School Board: Theatrical Rigging Assessments in four schools and development of specifications and plans for upgrades and repairs. July/02
- Community Theatre, City of Fort Saskatchewan: Feasibility study and Cultural Spaces Canada Grant Application. October/02
- Lloydminster Performing Arts Centre, Lloydminster, Alberta: Full theatre consulting services for a 500 seat school/community theatre. Friggstad Architects, Saskatoon. Opened in Feb/02
- Mount Royal College Concert Hall, Calgary, Alberta: Conservatory and Learning Centre Feasibility and Design Study with Cornerstone Planning, Vancouver. June/01 to Feb/02
- Emily Carr Institute of Art and Design, Vancouver: Expansion Facilities and Educational Feasibility Study. For Matrix Planning – Sept/01 to May/02
- Citadel Theatre, Edmonton, Alberta: Assessment of five performance venues in the context of repairs, refurbishments and upgrading of room finishes, infrastructure and technical systems. April/02
- Victoria Multi-Purpose Theatre, Capital Regional District, Victoria, BC: Building programming, capital budget and feasibility study. September/01
Prince Albert Performing Arts Centre, Prince Albert, Saskatchewan: Management services to set up the organizational structure, joint use agreements, budgets and staffing. July/98 to July/2001 - University of Victoria, Victoria, BC: Counterweight Rigging System Inspection Completed August/2001
- North Vancouver Performing Arts Centre, North Vancouver, BC: Management and operations study for a community theatre. January/2000
- Medicine Hat Theatre Feasibility Study, Medicine Hat, Alberta: Feasibility study for a new community theatre; City of Medicine Hat. May to Nov/99
- Saskatoon Theatre Facility Study, Saskatoon, Saskatchewan: Consulting services to Anderson/Fast Associates. May to Nov/99
- Sanscha Hall, Sydney, B.C: Management consulting services for a 250 seat theatre and 1000 seat exhibition/performance venue. July/99
- Staples Centre Arena, Los Angeles, California: Project Manager for the speciality rigging and lighting installation; Obie/Westsun Joint Venture. July/98 to Aug/99
- Growers Supply Building, Kelowna, British Columbia: Preliminary design phase with Hotson Bakker Architects. May/99
- Thorneloe University, Sudbury, Ontario: Full theatre consulting services for a 200 seat theatre. Jan/97 to Feb/99
- Madame Tussauds In Los Vegas: Project Management Services for the planning stage and initiation of this 22 Million Dollar Project. Feb to July/98
- Haines Junction Convention and Tourism Centre, Haines Junction, Yukon: Full theatre consulting services for this 240 multi-purpose flexible theatre. Sinclair & Associates, Whitehorse, Yukon. March/95 to October/97
- Westsun, Winnipeg, Manitoba: Project Management for the stage lighting rig for Disney’s stage production of The Lion King. Feb to Nov/97
- Yukon Arts Centre, Whitehorse, Yukon: Building assessment study and development of a capital improvement plan. July/Oct/97
- Whistler Centre for Business and the Arts, Whistler, B.C: Feasibility Study for a multi-purpose theatre. Nov/97
- Glass Blowing Studio and Gallery – Feasibility Study, Victoria, B.C: Nov/96
- Langley Performing Arts Centre, Langley, British Columbia: Feasibility study for a multi-purpose theatre. In partnership with Hotson-Bakker Architects. Project abandoned as a result of budget cuts; November/96
- Management Study, City of Surrey, British Columbia: operational review of the Surrey Arts Centre for new strategies to increase utilization. City of Surrey Parks and Recreation Department. May to October/96
- McKim Auditorium, Kimberley, B.C: Full Theatre consulting services for a 500 seat theatre. School District No.3 – Kimberley. August/95 to October/96
Vernon Performing Arts Centre, Vernon, B.C: Theatre design consulting services for the conceptual design of a 750 seat multi-purpose theatre. Downs/Archambault & Partners. April/96 to Sept/96 - Lloydminster Performing Arts Centre, Lloydminster, Alberta: design study for a 500 seat school/community theatre. Friggstad Architects, Saskatoon May/June/96
- Langham Court Theatre, Victoria, B.C: Feasibility Study for structural changes to the building and design of a new rigging system. Langham Court Theatre Society. May/June/96
- Victoria Symphony Orchestra, Victoria, British Columbia: Feasibility study for a new multi-purpose performance venue. Joint venture with Cornerstone Planning, Vancouver. Sept/December/95
- Community Theatre Feasibility Study, School District 27, Williams Lake, B.C: Feasibility study for a community theatre attached to a school. Nov/95
- Growers Supply Building, Kelowna, British Columbia: Design and feasibility study to determine the suitability of the Growers Supply Building as an arts centre. A Co-venture with Barbara Dalrymple Architect, Vancouver, B.C. Jan/Oct/95
- McKim Auditorium, Kimberley, B.C: Commentary on preliminary design. School District No.3 – Kimberley. August/95
Victoria Conservatory of Music, Victoria, British Columbia: Facilities programme update and estimation of project budget for Matrix Planning, Victoria. July/95 - O’Gorman High School Theatre, Timmins, Ont: Full theatre consulting services including design work, technical specifications and site supervision for Cotnam Belair Deshaies Architects, Timmins, Ont. May/92 to July/95
- Red Deer Memorial Centre, Red Deer, Alberta: Feasibility Study for theatre and stage renovation. Sub-contractor to M. Richards Engineering. June/95
Prince Albert Visual/Performing Arts Facility Study, Prince Albert Saskatchewan: A feasibility study to determine the viability of a visual and performing arts centre in Prince Albert. A Co-venture with Cornerstone Planning of Vancouver, B.C. Dec/94 to March/95
- Terrace Little Theatre, Terrace, B.C: Feasibility Study for a new building for this community theatre group. March/95
- The New Bastion Theatre, Victoria, B.C: General Management services to replace manager on leave. Jan/94 to Feb/95
- Kinsman Gazebo, Town of Banff, Alberta: Design/feasibility study to relocate and upgrade the outdoor bandshell. Jan/95
- Stanley Theatre Feasibility Study, Vancouver, B.C: Feasibility study to determine the viability of turning the Stanley movie theatre into two performance venues. A Co-venture with Cornerstone Planning of Vancouver, B.C. Dec/94 to Jan/95
- White Rock Theatre Project, White Rock, B.C: Design work and theatre equipment specifications for Chip Barrett Architect. June/88 to Jan/95
- Northern Alberta Jubilee Auditorium, Edmonton, Alberta: Study rewiring of the stage lighting circuits and dimming equipment. Subconsultant to Rogers Beaubiem Engineering. June to Oct/94
- Schumacher Community Feasibility Study, Schumacher, Ontario: Feasibility study to renovate an historic movie theatre to a community theatre, for the Schumacher Revitalization Program; May to November/94
- Port Coquitlam Theatre Feasibility Study, Port Coquitlam, B.C: A co-venture with Cornerstone Planning, Vancouver, B.C.; May to Dec/93
- Cave and Basin Theatre Feasibility Study, Banff, Alberta: Feasibility study for the conversion of the Cave and Basin swimming pool to an outdoor theatre, for the Banff Centre for the Arts. Sept to Nov/93
- Red Deer Memorial Centre, Red Deer, Alberta: Management Study for Central Alberta Theatre to investigate the potential for operating the Centre. Aug/93
- Red Deer Memorial Centre, Red Deer, Alberta: Engineering Study for stage renovation. Sub-contractor to M. Richards Engineering. June/July/93
- Phoenix Theatre, Edmonton, Alberta: General Management services, Feb to May/93
Perth Theatre Project, Perth, Ontario: Facilitator, Development Plan for a mixed use development downtown core of Perth. Oct/Nov/92 - Phoenix Theatre, Edmonton: Organizational Study – Assessment and Recommendations. December/92 – Jan/93
- Duchess Park Secondary School, Prince George, B.C: Community Theatre Design Study, A joint venture with Cornerstone Architects. Aug/Sept/92
- Deep Cove Arts Centre, Deep Cove, B.C: Design work and theatre equipment specifications for Cornerstone Planning and equipment purchase and commissioning for the Corporation of North Vancouver. 1987/92
- Esquimalt Secondary School Theatre, Esquimalt, B.C: Assessment of proposed design for School District 61, Sept/92
- University of Northern British Columbia, Prince George, B.C: Feasibility study for a 1400 seat theatre on the new campus, joint venture with Cornerstone Planning. December/91 – May/92
Alberta Pavilion – Salute to the Provinces at the Calgary Stampede/92: Design and coordination of exhibits for the Alberta Government – Cabinet Communications Committee. May-June-July/92 - Arden Theatre, St Albert, Alberta: Stage lighting circuit mapping and recommendations correcting substandard installation of stage lighting circuits. May/92
- Saanich Performing Arts Centre, Greater Victoria, B.C: Feasibility study for a new theatre. Subcontractor to Cornerstone Planning of Vancouver. Jan/March/92
- Williams Lake Theatre, Williams Lake, B.C: Team member to update a design study done by Schick Shiner and Associates in 1990. Subcontractor to Chip Barrett Architects of White Rock. Jan/92 [project waiting for funding]
- Lloydminster Performing Arts Centre, Lloydminster, Alb: Design work and technical specifications for Chomik/Crittenden Architects, Calgary. Aug-Oct/91
- Edmonton Convention Centre, Edmonton, Alberta: Design Study work subcontracted by Cohos Every Architects. June/91
- Williams Lake, B.C: Design and management study for Cariboo Regional District -350 seat studio/convention facility. June/90
- Tidemark Theatre Society, Campbell River, BC: Facility assessment and report. September/90
- Maple Ridge Theatre, B.C: Feasibility study and planning work for Cornerstone Planning. Design and management operating models, operating budgets and for Municipality of Maple Ridge, 1990
- Nanaimo Theatre Project, Nanamo, BC: Feasibility study work; management operating models, budgets (equipment operations), staffing for Cornerstone Planning. 1989
- Cranbrook Theatre, Cranbrook, B.C: Design work and theatre equipment specifications. Bob Mansfield Architect. 1988/90.
- Gibsons Landing Theatre Project: Facility development, fundraising, preliminary design work for the Gibsons Landing Theatre Project. 1987/88
- Hawrelak Park Outdoor Amphitheatre, Edmonton, Alberta: Design and planning work for Stephen Iu Architect. 1985
- Occidental College, Los Angeles, California: Equipment specifications for Brian Arnott and Associates. 1983/84
- Canada Council Study Grant: Six months in England studying and photographing British Theatre Architecture. 1982/83
- Citadel Theatre Phase II, Edmonton, Alberta: Staff consultant, site supervision, purchase and commissioning of theatre equipment. 1982/83
- Markham Theatre, Markham, Ontario: theatre equipment specifications and design work for Brian Arnott and Associates. 1982/83
- Neptune Theatre, Halifax, N.S: Feasibility study work, operating budget projections, theatre equipment budgets for Brian Arnott and Associates. 1979